From March 10 2010 to March 26 2010 the lead blocks were stacked in an array in the steel superstructure. Each lead block was stacked, a steel reinforcement ring was inserted for each block in the bottom 5 layers, each column was banded together and copper calibration tubes were placed in the appropriate locations.